Logistics and storage

The company is registered in the National Register of Trucking Goods on behalf of Third Parties and in the National Register of Environmental Managers in categories 1, 2bis, 4, 5, 8, 9, 10, therefore authorized to transport waste and goods (dangerous and not) on his own behalf and on behalf of third parties.

Ecologica is able to manage both logistic and storage needs on behalf of third-party companies through internal platforms.

Logistics

the fleet of ECOLOGICA vehicles is composed of:

  • SLIPPLE DRIVES
  • ROAD TRACTORS (2 AXLES)
  • WORK TRACTORS (3 AXLES)
  • CISTERNATED SEMI-TRAILERS
  • WHEELBAG SEMI-TRAILERS
  • CENTINATI SEMI-TRAILERS
  • TILTING SEMI-TRAILERS

Storage

Brundisium plant

The PLANT will be built in a specially designated area of 25,000 m2  inside the former industrial complex. Brundisium of Brindisi.

The identified area, located close to the port area, thanks to the connection through an underground pipeline in State concession to the Costa Morena pier, allows to minimize the loading / unloading and transport infrastructures of the raw material, moved by sea or by road according to customer needs. The main features of the SITE are shown in the table:

1.1

Intended use

Industrial - Area for port activities

1.2

Surfaces available

Total area of the industrial complex 25,000 m2

Urbanized area 10,000 m2

Surface currently built 2,300 m2

1.3

Land description

Practically flat asphalted land with large front access through a metal gate

1.4

General information

Availability of an underground pipeline connecting to the Costa Morena pier

Connection to the local road network and to the main communication routes (expressway and motorway)

Proximity to a railway junction

1.5

Environmental conditions

Climate zone C, 1083 degree days

Design temperature 15 °

Design humidity 75 %

Average water temperature 10 °

Altitude 0 m asl

Seismic class 4

The main interconnections of the SYSTEM are the following:

Port quay: for the supply of raw material (diesel, gasoline) by means of three pipes (piping line) currently 4 ", but with an extension of the same up to 12", with pipes dedicated to the different types of product to be stored.

 

Road connection: for the supply of raw materials also by road (where required), and of consumables and spare parts, through the internal viability of the port area, connected to the nearby motorway network and the railway junction.

 

The Terminal will consist of:

  • Quayside devices and quay connection pipelines - Industrial Complex. This connection consists of 3 4 ”pipes;
  • new tanks will be installed, up to a total capacity of 40,000 m3, to allow the storage of the raw material, which is expected to arrive primarily by ship;
  • Pumping and transfer station;
  • Tank truck loading / unloading area and equipment.